We’ve updated our charges and design standards
We’ve published our New Connection Charging Arrangements for 2024/25, as well as new versions of the following technical documents as part of our annual review of network policies: our Design and Construction Specification (version 4) and Annual Contestability Summary (version 4).
These documents have been published on 1 February 2024 to allow a 2-month notice period before they come into effect from 1 April 2024.
Popular services
If you're planning a new building or extension, here's what you might need to look at:
Water
supply
If you're building or converting a property you'll need to apply for a new water connection.
Sewerage connection
You'll need a sewerage connection to take wastewater away from a new building.
Building over a public sewer
You'll need to apply for permission if there's a public sewer within 3 metres of your planned building.
Looking for something else?
new
Calculate your estimate
Get an estimate for a new or replacement water connection:
- it’s free to calculate
- it takes less than 3 minutes
- you can calculate an estimate for up to three household water connections
- you’ll get a rough idea of the costs so you can decide what to do next.
This does not apply to large sites requiring new water mains or sewerage services.
Mains scheme estimate calculator
Calculate a free estimate for works on a large development site, including new water main installations and individual plot connections. Ideal for professional developers and self-lay providers.
This is a .xlsx document which can be opened with Microsoft Excel.
Apply online
Our online forms are the best way to apply:
- it’s quick and easy
- you can pay by card
- you can pay by BACS (bank transfer)
- we’ll remember your details to make applying even easier next time
- you’ll get an email confirmation when we’ve received your application
- you can upload all your supporting documents.
Unsure which developer service you need?
Whatever you're planning to build, we've created a guide to help you find what you need.
Our online forms are the easiest way to submit and pay for your application.
If you're building or converting a property you'll need to apply for a new water connection.
Apply for permission to build over a public sewer or for a new sewerage connection.
New Appointments and Variations (NAVs)
Bulk water supply and sewerage services.
Our performance reports show the level of service you can expect from us.
Our services charging arrangements.
Environmental incentives and credits
See what discounts are available for sustainable developments.
Everything you need to know about Developer Services.
Contact developer services
If you have a query or any feedback, please get in touch. We'd be happy to help.